Export Certification

Compliance That Clears Customs

Avoid rejected cargo and port demurrage. We supply the test reports and support the conformity documents your market requires.

In most of our active markets, the shipment does not fail because the cable is bad — it fails because the conformity file is incomplete, late, or inconsistent with the shipping documents. A regulated cable arriving in Mombasa, Lagos or Manila without its Certificate of Conformity is not a fine; it is demurrage by the day, re-inspection penalties, or rejection at the port. Everything on this page exists to prevent that.

Four schemes cover most of the cable work we ship: Kenya's PVoC, Nigeria's SONCAP, Indonesia's SNI and the Philippines' PS Mark/ICC. Each country card below opens the full process: who applies, which documents the file needs, how long the certificate takes, and what we supply from the factory side.

How we support your compliance file

The certificate is issued by the destination authority or an appointed inspection body — it is not ours to print. What the scheme actually consumes from us is evidence, and that is what we prepare:

  • Type-test and routine-test reports naming the exact construction — voltage class, insulation, armour type, conductor class — not a generic description.
  • CB certification where the construction is covered: our 0.6/1kV XLPE range holds CB certificates CN74209 & CN74210 to IEC 60502-1:2021.
  • ISO 9001/14001/45001 certificates, datasheets and HS codes for the application file.
  • Factory access for audits, witness sampling and pre-shipment inspection, booked against the production schedule so the certificate lands before vessel cut-off.
  • One consistent name: the manufacturer entity on the contract, invoice, certificate of origin and conformity certificate is spelled identically, character for character.

Not granted, not printed

We do not claim a national mark we have not been granted. Where a scheme requires the importer to hold the licence (SNI in Indonesia, TIS in Thailand, the ICC in the Philippines), we say so plainly and put our side of the file in order — technical evidence, samples, audit access. Where a per-shipment certificate is issued at export (PVoC, SONCAP), we build the inspection booking into the production schedule. This restraint is deliberate: buyers in these markets have seen every possible certification claim, and the honest file clears faster than the decorated one.