Pre-Export Verification of Conformity (PVoC)

A PVoC Certificate of Conformity is mandatory to clear regulated goods — including power cables — through Kenyan customs.

Issuing Authority

Kenya Bureau of Standards (KEBS)

Kenya's PVoC programme, run by KEBS through appointed inspection agents, ensures imported products meet Kenyan and international standards before shipment. Cables falling under the regulated list must obtain a Certificate of Conformity (CoC) in the exporting country; without it, goods face rejection, demurrage or a costly destination inspection with penalties.

Certification Routes

Route A – Consignment Certification

For occasional/trader exporters: testing and inspection of every shipment.

Route B – Product Registration

For frequent exporters: product type tested and registered, simpler per-shipment verification.

Route C – Licensing

For manufacturers with a certified quality system (e.g. ISO 9001): streamlined mark licensing.

Step-by-Step Process

  1. 1

    Send a request for certification with proforma invoice / product details to the appointed PVoC agent.

  2. 2

    Submit valid IEC test reports for the voltage class and standard edition of the goods (IEC 60502-1 for 0.6/1kV, IEC 60502-2 for MV, IEC 60227 for PVC wires) and ISO certificates.

  3. 3

    Goods are verified; where needed, samples are drawn for laboratory testing.

  4. 4

    Final pre-shipment / container inspection and sealing is arranged.

  5. 5

    The CoC is issued and accompanies the shipping documents for customs clearance in Mombasa/Nairobi.

Document Checklist

  • Commercial invoice & packing list
  • Bill of lading / airway bill
  • IEC type-test and routine-test reports
  • ISO 9001 / 14001 / 45001 certificates
  • CB certificate (0.6/1kV XLPE/PVC cables, IEC 60502-1) — for other voltage classes, type-test reports
  • Product specification / datasheet and HS code

Cables in Scope

  • XLPE insulated power cables (LV & MV)
  • PVC insulated building wires
  • Control and flexible cords
  • ABC / overhead conductors

Plan 7-15 working days for CoC issuance before vessel cut-off.

Need the right certificates for your Kenya shipment?

Tell us your product and destination. We will confirm the conformity route and provide the IEC test reports to support clearance.