Case Study
Mine Camp Electrification — South Gobi, Mongolia
LV power cable and building wire for a mine camp in the South Gobi, shipped against a fixed construction-season window.

Background
A mine development camp in the Gobi needed distribution cable and building wire for accommodation blocks, workshops and site utilities, delivered ahead of the construction season.
The site is remote and the delivery window short: material arriving after the season start would have sat until the following year, so the drum schedule was fixed at order acceptance.
Product specification
| Voltage class | 0.6/1 kV |
|---|---|
| Construction | LV power cable, Cu / XLPE / PVC; building wire BV/BVR for internal circuits |
| Conductor | Class 1/2 copper for fixed wiring; Class 5 for flexible drops |
| Standard | GB/T 12706.1 and GB/T 5023 for building wire |
| Application | Camp accommodation, workshop power, site lighting circuits |
Quantity
Multi-kilometre LV and building wire package
Detailed drum schedule and exact quantities are released on request — Exact lengths by size pending confirmation against the packing list.
Our role in the project
Manufacturer and exporter, shipping against a construction-season deadline set by the camp contractor.
Testing
- Conductor resistance and voltage withstand on every drum and coil
- Insulation thickness and overall diameter checks
- Colour and core identification verification before packing
Packing & delivery
- Power cable on wooden drums; building wire in coils with moisture-proof wrap
- Mixed loading plan prepared so the camp could build in sequence rather than stockpile
- Bilingual marking on request
Documentation available
Routine test certificates
Issued per drum and per coil batch.
Packing list
Size-by-size list matched to the camp’s bill of quantities.
Client names and commercial quantities are published only with the customer’s written permission. Test reports and datasheets for a specific construction are issued on request.
Related products
Need a similar scope?
Send the voltage class, core schedule, installation method and destination port — we will reply with construction, certificate scope and lead time.
Request a quote